Dewatering Project - Boulder Community Hospital
Telesto Solutions designed a full-scale dewatering system at the proposed site for a new hospital campus in Boulder, Colorado. The development of three prototype test drains and a pumping center resulted in an effective water management program that lowered the water table 10 to 15 feet prior to construction of buildings with basements set below the original water table. The site was successfully dewatered within three weeks and construction began on schedule, saving hundreds of thousands of dollars in future dewatering costs.
|